New additional Coldstore currently under construction in South America. - News

New additional Coldstore currently under construction in South America.

24 Mar 2016
2016 03 12 09.27.44 resize

Seward Refrigeration Ltd have designed the refrigeration plant and are currently project managing the installation. The building consists of a 125m (Long) x 17m (wide) x 32m (High) Coldstore, transfer passage way and loading dock. The refrigeration plant being installed is a two stage pumped ammonia plant providing -30°c pumped ammonia to the Coldstore and -2°c pumped ammonia to the transfer passage way and loading dock coolers. Compressor oil cooling is via glycol providing underfloor heating for the Coldstore. Total plant duty is rated at 1500kw.


Recent News

PLC Commissioning
14 Apr 2021

Recently two of our directors were involved in the commission of a brand-new PLC for a central ammonia glycol system at one of our customers sites.

Health & Safety - It's always better to be safe than sorry!
17 Mar 2021

We all know that we must be careful in everything we do in life, from crossing the road, driving a car to cooking your evening meal. You don’t want to obviously get run over, bump into a wall or burn yourself on the cooker.

But....

Supporting Local Rugby but for all the Nation to see!
15 Mar 2021

Our company logo has now made a 2nd appearance on live TV!

National Apprenticeship Week 2021
11 Feb 2021

Investing in the future is important for any business and we are proud to say that we are doing just that.

House Keeping....
10 Feb 2021

We must all follow certain “housekeeping rules” at work, stay within the set walkways, wear your high viz jacket and safety boots, but....


Seward are committed to offering the best solutions, the greatest efficiency, the strongest reliability, and the best service to all our clients. CALL US NOW ON 0161 724 0357

Linkedin